Download BS 5974:2010: Code of practice for the planning, design, PDF

Briefly suspended entry gear (TSAE) aid or comprise employees operating at peak on engineering and development websites. BS 5974 offers advice and proposals on fitting (erecting, changing and dismantling), conserving, analyzing and utilizing TSAE in a secure demeanour. It additionally units out the obligations of all employees excited about operating with TSAE.

BS 5974 makes strategies for the choice, layout, set up, inspection, use and upkeep of briefly put in suspended entry equipment/systems (TSAE), as outlined in BS EN 1808. Non-standard installations also are coated via this code.

TSAE could be a operating platform or structures, paintings cage or chair suspended from a suspension rig which might be assembled on the workplace, used to hold out particular initiatives. TSAE will then be dismantled and faraway from where of labor whilst the explicit projects are entire for use elsewhere.

The apparatus said in BS 5974 is usually suspended from metal cord ropes which are hooked up to the outriggers of a suspension rig or different compatible high-level anchor element. it's in a position to being raised or diminished through a winch or hiking equipment that may be hooked up both to the operating platform(s), paintings cage or chair or be included into the suspension rig. The lifting equipment or home equipment should be manually or strength operated. In definite situations, the TSAE could be integrated right into a process that permits it to be traversed horizontally.

Steeplejacks and steeplejack operations are usually not coated in BS 5974. It additionally doesn't disguise completely put in suspended entry apparatus, that gear is roofed by way of BS 6037-1.

Requirements for slung scaffolds, being operating systems on scaffold tubes or twine ropes yet which can't be raised or reduced by means of the consumer, are contained in BS EN 12811-1.

This model of BS 5974 is an entire revision of the normal, and introduces adjustments because of the following:

• alterations in laws, specifically the creation of the Lifting Operations and Lifting apparatus rules (LOLER) 1998
• Advances in technology.

This model of BS 5974 replaces BS 5974:1990, that is now withdrawn.

Show description

Read or Download BS 5974:2010: Code of practice for the planning, design, setting up and use of temporary suspended access equipment PDF

Similar equipment books

Digital Photographer, Issue 174

Within the electronic Photographer Annual, we’ve compiled a wealth of positive aspects and tutorials that cater for everybody, from newbies to veterans. you could get pleasure from revealing interviews with the various world’s so much acclaimed photographers, notice the secrets and techniques to capturing wonderful landscapes and wonderful pics with our technical courses, and get expert pointers on snapping weddings, natural world and every thing in among.

Managing the Effective Use of Equipment Super Series, Fifth Edition (Super Series)

Tremendous sequence are a collection of workbooks to accompany the versatile studying programme particularly designed and built via the Institute of management & administration (ILM) to aid their point three certificates in First Line administration. the training content material is usually heavily aligned to the extent three S/NVQ in administration.

Fluidic Components and Equipment 1968–9

Fluidic elements and kit 1968—9 provides info on quite a lot of fluidic parts, platforms, recommendations, and kit. the various many ways during which fluid interplay can be used to accomplish important services are defined, and commonplace components, circuits, and structures are defined.

Additional info for BS 5974:2010: Code of practice for the planning, design, setting up and use of temporary suspended access equipment

Example text

Electrical protection should also be provided against phase reversal in a 3‑phase system. No live parts should be exposed when the equipment is assembled and in use. Access to control circuit panels and other items of electrical equipment (other than interconnecting cables and control units) should be via doors fitted with locks or via panels requiring some form of tool other than a coin to open. Where locks are provided, the keys should be retained or controlled by an electrically‑competent person.

Maintenance intervals should be set to take into account such factors as the intensity of use, the operating environment and the consequences of TSAE malfunction or failure occurring in a high risk location. It is important that sufficient time is allowed in the site work programme for maintenance to be carried out effectively. Maintenance should only be carried out by persons who are both familiar with the equipment and competent to carry out the work, or who are in the process of gaining experience and are working under supervision.

It is not possible to recommend the age at which wire suspension ropes should be taken out of service because of the many variables affecting the ageing process. Special care should be exercised during examination if a wire rope is more than two years old. NOTE A useful reference for wire rope discard criteria is BS ISO 4309. 5 Examination of platform The platform decking, toe board and guard rails should be examined for correct functioning and mechanical integrity. Special attention should be paid to connections between sections including any hinges.

Download PDF sample

Rated 4.55 of 5 – based on 28 votes